Client & Project
DUCO
BP Foinavon Life of Field Seismic Development
Project Type
Dynamic Umbilical Termination Assembly
Field Overview
Field is located in blocks 204/19 and 204/24a in the UKCS.
Partners BP Exploration. Shell. Recoverable reserves are estimated to be in the region of 250 to 600 million barrels of oil.
The developments centre on subsea wells completed on the seabed. They produce oil, via a manifold, which passes through rigid flowlines and then flexible risers into a FPSO
Operator/Owner
BP
Contractor
McNulty Offshore Construction Limited
Work Locations
McNulty Quay, South Shields
Contract Duration
Mar 2001 – Sep 2001
Scope of Work
Fabricate Dynamic Umbilical Termination Assy (DUTA)