Client & Project

Wood Group
Piper Bravo


Project Type

Inlet Heater


Field Overview

Piper field is located on block 15/17 (P.220) in the UKCS.

Partners: Talisman, Transworld Petroleum, Lasmo. Interpid Energy

Production initially started on Piper Alpha in January 1973 with the replacement Bravo platform restarting production in 1993.

Oil reserves are 144 million tonnes (recoverable)


Operator/Owner

Talisman Energy


Contractor

McNulty Offshore Construction Limited


Work Locations

McNulty Quay, South Shields


Contract Duration

October 2006 – December 2006


Scope of Work

Fabricate Inlet Heater Module 6.5mt x 3.5 mt x 3.7 mt weight 25te
Management, Construction Engineering, Procurement (part), Fabrication, Mechanical Completion (inc. offshore pre-installed structures and pipe spools).

Installation of free issue Inlet Heater, junction boxes and associated cabling.

Piping hydrotesting and Nitrogen blanket preservation.