Client & Project

Texaco
Erskine Project


Project Type

Integrated Deck


Deck Specification

Wellhead Platform

Normally not manned (NNM) installation with 2 deck levels fitted with temporary refuge and integral helideck.

1250te with dimensions 40m x 22m x 12m

Operating pressure 15000psi


Operator/Owner

Texaco


Contractor

McNulty were part of an EPIC Integrated team


Work Locations

McNulty Quay, South Shields


Contract Duration

June 1995 – April 1997


Scope of Work

HP/HT Field.

Integration Management, Construction Engineering, Procurement, Fabrication, Mechanical Completion of 1,200te Integrated Deck which infrastructure included:

  • Power Generation,
  • Temporary Safe Refuge,
  • Chemical Injection package and a Aluminium Helideck.