Owners & Project

Maersk Oil North Sea UK Ltd
Dumbarton Project


Project Type

FPSO


Vessel Specification

Dimensions:
L200 x B38 x D23m,

Gross Tonnage:
53,000te Separation Capacity: Oil 100,000 bopd, Total Liquids 170,000 bpd, Produced Water 300,000 bwpd, HP Compression 84 mmscfd, Oil Export Storage 450,000 bbls, Gas Export 13-27 mmscfd


Engineering

Aker Kvaerner


Fabrication & Integration

McNulty Offshore Construction Limited


Work Locations

Dry Dock, Hebburn and McNulty Quay, South Shields


Contract Duration

January 2006 – December 2006 (vessel arrived 9th July 2006 and left 9th November 2006)


Scope of Work

Brown Field Development.

Management integration, Procurement, Construction Engineering, Fabrication, Installation, Commissioning and Offshore Hook Up.

Removed and decanted and/or decommissioned 500te of redundant equipment, materials and liquids.

Install 1,000te of new topside equipment packages, pumps and structures, LER & Rigging store (150te), Water Injection, LP & HP Compressors (620te), Condensate Dehydration (170te), Suction Scrubbers, Electric Chlorination, Crude Coolers.