Owners and Project

Amerada Hess (UK) Limited
Rob Roy / Ivanhoe Development Project


Project Type

FPU


Vessel Specification

Dimensions:
L82m, B75m, H30m, Accommodation: 100 persons


Capacity:
Oil 60,000 bopd,
Produced Water 45,000 bwpd, Water Injection 92,000 bwpd, Gas 58 mmscfd


Engineering

Brown & Root


Fabrication & Integration

McNulty Offshore Construction Limited


Work Locations

McNulty Quay, South Shields


Contract Duration

Aug 1987 – Apr 1989


Scope of Work

Management integration, Procurement, Construction Engineering, Fabrication, Installation, Commissioning assistance and Offshore Hook Up.

Removed and decanted and/or decommissioned 3,000te of redundant equipment, materials and liquids.

Install 12,000te of new topside equipment packages, pumps and other associated structures including flare and modifications to pontoons and strengthening of decks and columns.

  • SGS 9001:2001
  • SGS 14001:2004
  • SGS 18001:2007
  • 50th Anniversary British Safety Council
  • DNV
  • First Point Assessment
  • Achilles
  • Verify
2010 © McNulty Offshore Construction Ltd