Owners & Project
Maersk Contractors
Project Type
Drilling Rig
Rig Specification
Design: CFEM T-2005-C, Built by Dunkerque in France in 1982.
Operational water depth max 300 ft and max drilling depth 25,000 ft
Engineering
N/A
Contractor
McNulty Offshore Construction Limited
Work Locations
McNulty Quay, South Shields
Contract Duration
Dec 1994 – Mar 1995
Scope of Work
Spud can inspection and 5 year work over and maintenance










