Owners & Project
Stena Drilling
Project Type
Semisub
Rig Specification
Design: Friede & Goldman L-907,
Max Operational water depth 1,500 ft with max drilling depth of 20,000 ft
Engineering
Stena
Contractor
McNulty Offshore Construction Limited
Work Locations
McNulty Quay, South Shields
Contract Duration
Aug 1991 – Dec 1991
Scope of Work
Fabricate and install piping systems, upgrade Galley, install top drive unit