Owner & Project
Siemens Transmission and Distribution Limited.
Greater Gabbard Offshore Wind Farm Project. / Galloper Development
Project Type
Topside Substation Structure
Overview
Greater Gabbard Offshore Wind Farm Development, situated off the Thames Estuary.
140 Wind turbines feeding and 2 No. Offshore Substations (Gabbard and Galloper) in the
Engineering
McNulty Offshore Construction Limited/Atkins PLC
Contractor
McNulty Offshore Construction Limited
Work Location
McNulty Quay,
Contract Duration
Jan 2009 – May 2010
Scope of Work
Design, detailed engineering, procurement and fabrication of 1250 te Offshore Substation.
Design, Equipment Procurement, Fabrication and commissioning of an Offshore Substation for the Galloper Offshore Wind Farm Development. All equipment other than