Client & Project
Texaco
Erskine Project
Project Type
Integrated Deck
Deck Specification
Wellhead Platform
Normally not manned (NNM) installation with 2 deck levels fitted with temporary refuge and integral helideck.
1250te with dimensions 40m x 22m x 12m
Operating pressure 15000psi
Operator/Owner
Texaco
Contractor
McNulty were part of an EPIC Integrated team
Work Locations
McNulty Quay, South Shields
Contract Duration
June 1995 – April 1997
Scope of Work
HP/HT Field.
Integration Management, Construction Engineering, Procurement, Fabrication, Mechanical Completion of 1,200te Integrated Deck which infrastructure included:
- Power Generation,
- Temporary Safe Refuge,
- Chemical Injection package and a Aluminium Helideck.