Owners & Project

Penrod Drilling


Project Type

Drilling Rig


Rig Specification

Designed and built by Le Tourneau (class 116-C) in 1981 in Singapore

Operational max water depth 225 ft

Operational max drilling depth 25,000 ft


Engineering

N/A


Contractor

McNulty Offshore Construction Limited


Work Locations

McNulty Quay, South Shields


Contract Duration

Sep 92 – Oct 1992


Scope of Work

Spud can inspection and general 5 year inspection and maintenance workover